Server move soon a reality
So a short update. As we will be moving soon, we wont be able to have the same setup at home as now. This means the current Server/DAS will be moved to an external hosting provider in Sweden. This is expected to happen sometime during the end of december and will cause some downtime while the move is happening, more info will be provided by mail to those affected.
I will be replacing the server we move with a tower server as we need to have some sort of play ground.
Currently the new setup will look something like this:
– Motherboard: Supermicro X8DTI-F
– CPU(s): 2x Intel Xeon X5675 Hexa-core 3.06 GHz 12MB Cache (12 Cores, 24 Threads)
– CPU coolers: 2x Cryorig H5 Universal
– Case: Nanoxia Deep Silence 5 Rev. B
– Memory: 96GB (12X8GB) DDR3 ECC FBDIMM
– Raid Controller 1: LSI 9260CV-4i PCI-E 512MB Cache (CacheVault)
– Raid Controller 2: FTS Controller SAS 6G 5/6 512MB Cache (D2616)
– Raid Controller 3: FTS Controller SAS 6G 5/6 512MB Cache (D2616)
– HDD set 1: 4x 500 GB SSD Samsung EVO 850 (Virtual machines) – RAID10
– HDD set 2: 8x 3000 GB SATA 7.2k RPM Disks (Storage) – RAID50
– HDD set 3: 8x 3000 GB SATA 7.2k RPM Disks (Storage) – RAID50
– PSU: Corsair RM1000x 1000W – 80 PLUS® Gold Certified
– UPS: PowerWalker VFI 3000 LCD
– Software/OS: Proxmox VE 4